A gable-roofed building raised on a concrete ground slab in Bell-lloc.
What was built
The photos cover the structural phase: galvanised tube portal frames with columns and rafters rising to the ridge, purlins and bracing, assembled from scaffolding and ladders. Next to the site, the bundles of roof and wall panels are waiting. The close-ups show the ridge and corner connectors, with their plates and bolts.
The connectors: the key to the system
These connectors are the basis of the StarModul system: patented parts that are bolted to the tubes, with no welding. The tubes arrive cut and drilled, are set in place and fixed with bolts, and the kit is completed with roof and wall panels and flashings. The structural calculation is done by an engineer and manufacturing takes about a month. More on steel structures for industrial buildings, or request a quote.